| A
detailed look at how we work with you.
Phase
3: Technical Engineering
A database structure is created outlining functionality, input
fields required, error/success pages, administrative user levels,
login, registration, cookies and password issues. Programming for
functionality and database-driven elements as described by the database
overview/Web flowchart begins. Web administration tools and menus
are developed. Forms that interact with potential visitors will
be created.
The goal of this stage will be to create a robust and dynamic Internet
presence with intuitive system features. The scope of work will
include the creation of all the staged components. Typically, however,
a series of minor revisions and final iterations will take place
after the initial build until we have achieved the final functioning
component item. The finalized component will be used for integration
into the interface.
Alpha testing will be performed internally. Then, a beta version
of the Website will be uploaded to the staging area showing Web
page flow of the proposed primary, secondary and tertiary pages.
This involves ‘weaving’ the home page with all templates
below it to create a ‘clickable’ version of the Website.
See Phase 4 >>
|